Setting up your portable home

PG Portable Homes does not include installation services. Your portable home comes with a extensive installation guide to assist with the expansion and fit out of your home. Installation can be broken down into 8 main processes:

1. Prepare site

Ensure your site is level and your footing foundations are in place.

Our step by step guide will outline footing positions and any council requirements.

2. Delivery

Crane unit into position on the central footings.

Remove any non-affixed interior and external components from inside the unit.

3. Expansion

Raise the ceilings, lower the floor and walls of each side onto the footings.

Open shorter walls and fasten to roof and walls. This process needs many hands.

4. Tape

Use provided rubber tape to seal walls, ceiling and connection floor points.

Silicon can also be used for sealing.

5. Walls & trim

Fit and fasten all internal walls for bedrooms.

Fit trim to skirting, cornices, floor and ceiling.

6. Kitchen

Assemble prebuilt kitchen cabinets, countertop, and sink. Silicon edges.

Screw in LED oyster lights.

7. Connect

Get your electrician and plumber to connect power and water.

8. Move in

Welcome to your new home.

Video Demonstration

Here is a brief overivew video demonstating how easy PG Portable Homes can be installed.  You simply unfold, connect and move in.